Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/u714746901/domains/vsdsolution.in/public_html/wp-content/plugins/essential-grid/includes/item-skin.class.php on line 1041

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/u714746901/domains/vsdsolution.in/public_html/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/u714746901/domains/vsdsolution.in/public_html/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/u714746901/domains/vsdsolution.in/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3708
3D Modeling – Virtual Steel Design Solution

Warning: A non-numeric value encountered in /home/u714746901/domains/vsdsolution.in/public_html/wp-content/themes/goodenergy/fw/core/core.reviews.php on line 214

Warning: A non-numeric value encountered in /home/u714746901/domains/vsdsolution.in/public_html/wp-content/themes/goodenergy/fw/core/core.reviews.php on line 214

3D Drafting

Our expert team provides 3D solution for various types of building, commercial malls, hospitals, airports, railways, Infrastructure, industrial and production plants and much more. We are well versed with specifications across the world to ensure consistent modelling standards.

  • Circular & rectangular all type of Heaters
  • Reformers
  • HRSG (Heat Recovery Steam Generation)
  • APH (Air Pre Heaters)
  • Plant Ducting
  • Stacks
  • Utility building structures
  • Pipe Racks
  • Composite structures
  • Chemical plants
  • Power generating units
  • TG Buildings
  • Boiler structures
  • Hoppers
  • Equipment foundations
  • Pre Engineering Buildings
  • Cement Plant structures
  • Oil and Gas Structures

Our Recent Projects